What are the installation methods for the grid? What range is applicable?
Time:2019/4/1 14:57:09      Click:1494

There are many ways to install the grid. The most common methods and the applicable scope are as follows:

1. High-altitude bulk method. The high-altitude bulk method is divided into a full-support method, a partial movable bracket method and a cantilever method. This method is suitable for large-scale assembly of brackets in difficult lifting situations. When installing the grid using this method, pay attention to the position of the elevation and the axis to determine a reasonable assembly sequence.

2. Striping or block grid installation method. The welding and assembling work of the grid installed by this method must be completed on the ground, and the equipment cost of the crane is reduced by using the equipment of the construction site, which greatly saves the cost.

3. High-altitude slip method. To use this grid installation method, first divide the grid into strips of grid units, and set the rails in advance to slide the grid to a pre-designed location. This grid mounting method is suitable for applications that span engineering and require three-dimensional cross-over construction.

4. The overall lifting method. This method requires a method of lifting the grid to a fixed position after the grid is installed on the ground. This method is suitable for grid structures that are within the range that lifting equipment is allowed to withstand. Pay attention to the control of the synchronous rise of the grid during the implementation process.

5. The overall promotion method. This method requires a truss structure with a large number of peripheral supports. It is required to install a truss lifting device on the structural column to raise the truss installed on the ground to a desired position.

6, the overall jacking method. This method requires the method of splicing the grid into a whole on the ground and then lifting the grid to the design height with a jack. This method is suitable for point support grids, and requires a good control of the verticality control of the grid.


Prev:Selection of steel structure of gymnasium grid
Next:Steel grid processing, installation and inspection

go back

RELATED NEWS

Guess you're interested...

主站蜘蛛池模板: 久久69视频| 中文字幕欧美久久日高清| 窝窝午夜精品一区二区| 国产精品日韩电影| 亚洲少妇中文字幕| 日本一区二区三区中文字幕| 91一区在线观看| 91精品系列| 国产乱子伦农村xxxx| 天天干狠狠插| 扒丝袜网www午夜一区二区三区| 国产精品一区二区在线看| 亚洲精欧美一区二区精品| 免费高潮又黄又色又爽视频| 久久99精品一区二区三区| 亚洲乱小说| 91国偷自产一区二区介绍| 日韩午夜毛片| 欧美日韩亚洲另类| 日韩av中文字幕第一页| 亚洲欧美日韩三区| 日韩欧美一区精品| 野花国产精品入口| 视频一区二区中文字幕| 国产伦精品一区二| 国产精品久久91| 国产韩国精品一区二区三区| 精品免费久久久久久久苍| 久久综合二区| 右手影院av| 国产精品香蕉在线的人| 午夜电影一区二区三区| 波多野结衣女教师30分钟| 精品欧美一区二区在线观看| 久久精品手机视频| 久久久久国产精品免费免费搜索| 91久久国产视频| 欧美日韩一区二区三区精品| 欧美一区二区三区精品免费| 中文字幕理伦片免费看| 午夜av网址| 99re热精品视频国产免费| 狠狠色噜噜狠狠狠狠2018| 男女无遮挡xx00动态图120秒| 亚洲国产一区二区精品| 中文字幕av一区二区三区高| 少妇中文字幕乱码亚洲影视| 夜夜夜夜曰天天天天拍国产| 91人人爽人人爽人人精88v | 国产乱码一区二区| 亚洲精品卡一卡二| 日本一区二区三区中文字幕| 国产精品综合一区二区三区| 99日韩精品视频| 香蕉久久国产| 国产精品美女久久久免费| 日韩欧美多p乱免费视频| 爱看av在线入口| 国语对白老女人一级hd| 亚洲国产视频一区二区三区| 国产在线不卡一| 香港三日三级少妇三级99| 久久国产精彩视频| 国产精品一区二区日韩新区| 亚洲欧美日本一区二区三区| 97久久精品人人澡人人爽| 夜夜精品视频一区二区| 国产乱xxxxx国语对白| 国内精品久久久久影院日本| 欧美精选一区二区三区| 久久国产精品免费视频| 99精品国产一区二区三区麻豆 | 伊人av综合网| 亚州精品中文| 亚洲欧美中日精品高清一区二区| 一区二区欧美视频| 一区二区三区电影在线观看| 91麻豆精品国产91久久久久| 亚洲欧洲一区| 久久久久久中文字幕| 亚洲欧洲日韩在线| 国产69精品久久|